Me and Dan went out of college today to go and test out the camera track at different locations. This involved us carrying a 1.5M long Box with the track inside, dolly, HD video camera & tripod.
We went to the church not far away from our college to start of with, as it was a quiet place we wouldn't be in the publics way. The set up of the equipment seemed to be faster than we thought it would be. We got the whole equipment set up in less than 2 minutes.
We recorded two versions at this location, one of me being the actor, and one of dan being the actor. This made it sure we both had chance behind the camera and use of the equipment.
We then moved location to a new property area, which has new modern buildings we thought would be good for the backdrop.


